MI · CITY-LEVEL COVERAGE · SOURCE CONNECTED
Dumpster permit leads in Detroit
Permit Radar helps independent roll-off dumpster and debris-hauling businesses research potential demolition, roofing, construction and renovation work in Detroit. These are project signals from Detroit building permits, not customer inquiries or exclusive jobs.
One 7-day Local trial per verified account. No card or automatic charge. Start the trial when you are ready.
Weekly jobsite signals in Detroit
Qualified issued permits per week, counting each jobsite once.
View as table
| Week ending | Jobsite signals |
|---|---|
| Jul 14 | 2 |
| Jul 21 | 6 |
| Jul 28 | 7 |
| Aug 4 | 6 |
| Aug 11 | 8 |
| Aug 18 | 8 |
| Aug 25 | 4 |
| Sep 1 | 8 |
| Sep 8 | 5 |
| Sep 15 | 6 |
| Sep 22 | 5 |
| Sep 29 | 7 |
What kind of work, last 30 days
Project mix of qualified issued permits.
- Roofing2392%
- Renovation14%
- New construction14%
Most recent issue date in the feed: Sep 25. Counts are research signals, not confirmed demand.
INSIDE YOUR DETROIT WORKSPACE
Go from chart to shortlist.
Every plan opens the records behind these counts with the reasons each one ranks where it does.
- Ranked opportunities with plain-language reasons
- Jobsite ZIP hotspots
- Daily email brief of newly issued permits
- Fleet-fit shortlist for your container sizes
- 12-week trend and project-mix analytics
- CSV export and original source links
What this market includes
City of Detroit building permits. Contractor names are not available in this connector; volume is lower than other markets.
1,463 research matches in the current 90-day collection. Feed status: live. Last successful check: 2026-09-29. Research counts include applications and review candidates, not a promise of daily qualified leads.
How to evaluate Detroit projects
Detroit volume is lower than larger markets and contractor names are not published in this feed. Roof replacements are the most common signal; review each scope and address before outreach.
- Select Detroit as a market in your plan.
- Filter by project type and issue-date window. Review the source record and current status.
- Compare the address and likely scope with your service ZIPs and container fleet.
- Record your next step and verify timing, responsibility and service needs with the business.
New to permit research? Read the guide to building a permit-based shortlist, or the focused guides on roofing and demolition permits.
Detroit permit leads: common questions
Does Permit Radar cover all of Michigan?
No. This page describes the Detroit jurisdiction only. Other cities in Michigan are not included unless they are listed on the coverage page.
How often is Detroit permit data updated?
Permit Radar checks Detroit building permits every six hours. The last successful check was September 29, 2026. Cities can publish records late, so recent counts may still change.
How much does Detroit permit research cost?
Local is $49 per month for one supported market such as Detroit. Growth is $99 per month for up to 5 markets with sales follow-up tools. Scale is $199 per month for every connected market, team access and a read-only CRM API. Each verified account can try Local free for 7 days without a card.
Do these permits guarantee dumpster demand?
No. A permit may be delayed, revised or already served by another supplier. Confirm the scope, timing and responsible business before outreach.